INFORMÁCIÓ ÉS AJÁNLATKÉRÉS
INFORMATION AND QUOTATION
Vissza
Home > News > The Art of Installing Large Glass Panels: A Technical Journey with KAV

The Art of Installing Large Glass Panels: A Technical Journey with KAV

Nagy üvegfelületű alumínium nyílászárók beépítése
2023 / 06 / 29

In recent times, we have shared several recordings depicting the installation process of large glass surfaces as part of KAV’s daily operations. To shed light on the distinctions in window installation and preparation when incorporating larger glass sizes into a property compared to standard glass dimensions, we interviewed Mr. Péter Nagy, Senior Engineer, and Mr. Károly Lovász, CEO of KAV.

NP: The installation of large glass surfaces necessitates meticulous pre-planning, distinct from the usual window application, and requires specialized manufacturing processes and work organization. When executed appropriately, the installation of jumbo glass panels becomes a more straightforward task. Naturally, it is imperative to bring the attention of our clients to the fact that the cost of large glass sizes is exponentially higher, and even the fabrication and installation of the supporting structures are not straightforward. Unfortunately, domestic manufacturers often struggle to produce these sizes, which is why we sometimes have to resort to imports. Abroad, glass processors equipped for this purpose can effortlessly manufacture tempered, triple-layer glass panels measuring 3.2×7 meters. Furthermore, a German company, owing to its specialized tempering furnace and infrastructure, can even produce insulated glass panels measuring 3.2×13 meters.

Today, we typically discuss manufacturing sizes ranging from 3.2×5 meters for average glass surfaces. For this size range, major domestic manufacturers are adequately prepared up to a certain weight limit. However, for larger tempered glass surfaces or those exceeding specific weight thresholds (as automated production lines cannot withstand the load), a separate approach is required. For instance, the recent large panels we installed weighed around one and a half tons each, featuring considerable thickness and a special layering. Since these panels were installed in exposed locations and positioned upright, they had to withstand substantial stress. Consequently, we had them manufactured in Poland, ensuring color consistency, and shipped all other glass panels for the project from there. We always order glass from a single manufacturer for each building, and if replacement glass is required due to breakage or potential warranty issues, we order from the same manufacturer. This is a fundamental rule we adhere to.

LK: The initial step in pre-planning involves comprehending the architectural concept, followed by the design of window structures and the planning of operable and lockable surfaces based on this concept. During client consultations, which we refer to as “needs assessment” at KAV, we clarify the type and quality of windows the client wishes to see, the visual effect they desire after the finishing of interior surfaces, how they intend to use these spaces, what elements they wish to motorize, and what they do not. Once we have established where we open and close, the height we can achieve with each panel, and the aspects to consider in terms of shading technology, fine-tuning follows. This is when we calculate the weights and consider the weight distributions caused by the glass panels. We need to understand how to address the load-bearing elements beneath them, whether dynamic loads need to be considered, if the structure can bear the weight, or if alternative solutions are necessary, possibly involving the assembly of multiple smaller pieces. We refine the design until a solution is reached that the client accepts and we can professionally endorse. Subsequently, genuine planning takes place, including considerations such as drainage and dynamic movement – for instance, when moving a 700-kilogram sliding sash in front of a fixed one, the weight increases to one and a half to two tons. We also plan the weight transfers and junctions. Afterward, we coordinate this with the builder and, if it aligns with their requirements, with the general contractor and project manager as well. The finalization of plans is followed by specialized planning, and after the building’s structural elements are in place, we conduct a survey. At KAV, we no longer rely on traditional measuring methods but instead utilize 3D scanning of the building, with our engineers working with point clouds. The building’s characteristics determine what we can achieve since windows must function harmoniously with other elements of the structure. If the building cannot bear the load or requires substantial structural reinforcements, we may have to advise the client against using large glass panels, as it would entail significant costs and time.

NP: With large glass panels, traditional aluminum window manufacturing practices must be set aside. These structures involve heights and widths that can only be achieved through bespoke construction. During pre-planning, numerous bespoke constructions, components, supports, and expansion joints, as well as 3D-printed details, must be devised, which we either produce ourselves or source from external suppliers. Uniqueness is the key factor that permeates the entire process, from design through manufacturing, packaging, to transportation. For instance, during transportation, larger elevated structures may not fit under bridges if placed on conventional trucks and standard supports. Another critical aspect is glass bonding: we manufacture the frame systems and frameless sliding or bonded-opening structures for the large panels in our Kisbér facility in two phases, then transport them to the installation site. This is referred to as two-stage transportation due to the time lag, which demands sophisticated logistics. Additionally, it’s worth noting that in some cases, it may be necessary to airlift a window, which might even prove more cost-effective than road transportation. We explore every possibility to find the best solution, one that imposes the least burden on the local community, as these installations always take place in residential areas. Naturally, we must also consider future glass replacements, as glass, being an amorphous solid, can easily break. It is not elegant to dismantle a completed garden due to glass replacement, so this aspect must be clarified with the client during the planning phase.

LK: From this discussion, it becomes evident that the time-consuming aspect of large glass installations is not the installation itself but rather the operational and administrative processes, which must be meticulously planned to eliminate margin for error. In the case of the building shown in the video, the installation of the frame systems took approximately three weeks before the final securing and sealing of the aluminum structures and glass surfaces. The process concludes with the mechanical and electronic assembly of all window systems, followed by their trial operation. We hope that this explanation helps our clients understand that, without specialized planning, there is no shortcut for special or large window installations. Every architect would prefer to bypass this step, as it incurs costs, but the necessity of specialized planning must be acknowledged.

The Art of Installing Large Glass Panels: A Technical Journey with KAV
01
00
The Art of Installing Large Glass Panels: A Technical Journey with KAV - 1
The Art of Installing Large Glass Panels: A Technical Journey with KAV - 2
The Art of Installing Large Glass Panels: A Technical Journey with KAV - 3
The Art of Installing Large Glass Panels: A Technical Journey with KAV - 4
The Art of Installing Large Glass Panels: A Technical Journey with KAV - 5
MoreNews
01
020
2022 / 10 / 07
Schuco-curtain-wall-minimal-luxury-house-glass-front-door-exterior-facade-luxury
The relationship between aluminium doors and windows and the façade
In parallel with the advent of the latest aluminium door and window solutions, including filigree case systems and large glass surfaces, façades have also been transformed in the family home market. In addition to functionality, design also plays a key role in more and more buildings. However, architects rarely involve professionals in the process of designing doors, windows and façades. According to Krisztián Vatai, executive director of Facade Design & Building, who is engaged in the design, construction and production of façades, a change of attitude and education is needed to change this.
Show more
2019 / 01 / 28
What direction will the construction industry take?
What direction will the construction industry take?
Report on the BAU MESSE exhibition in Munich
Show more
2023 / 01 / 02
Schüco-alumínium-emelő-toló-harmónika-ajtó-étterem-terasz-kapcsolat-homlokzat-sas-baba
A communal gastronomic space where the fusion of outdoor and indoor is facilitated by KAV glass portals
BABA Budapest is not merely a restaurant; it is a space where one can feel at home throughout the day. The main principles of design focused on the seamless transition between indoor and outdoor spaces and the creation of a genuine sense of community experience. We had the opportunity to discuss the BABA with its lead designer, Dóra Fónagy, while sitting at one of its tables, and during our conversation, we ourselves experienced why it provides a truly unique experience.
Show more
2017 / 12 / 20
Ethical operations raise even SMEs to the top
Ethical operations raise even SMEs to the top
Following the large enterprise sector, operating ethically is becoming increasingly important for small and medium-sized enterprises, too. These companies not only take into account the interests of their clients and suppliers but also those of their environment and employees. They set an example by their activity and attitude and strengthen trust. This attitude may constitute a basis for long-term operation and economic stability, and what is more, employees of the Y and Z generations are more eager to opt for an ethically operating workplace.
Show more
2020 / 04 / 21
Schuco-Reynaers-aluminium-window-door-slide-glass-interior-fassaden-night3-k
A refined aesthetic for doors and windows
The popularity of the minimalist style in architecture is one of the reasons that aluminium doors and windows entered the family house sector. Applying the principle of “less is more” to architecture led architects and designers to use unique solutions and austere or transparent surfaces. In a minimalist home, simple shapes and forms help create an atmosphere of harmony, where space itself serves humanity.
Show more
2021 / 05 / 03
alumínium-ablak-függönyfal-nyilászáró-jumbo-nagy-méretű-üvegezés-üveg-üvegpanel- egyedi-beemelés-ablak-beépítés-üvegező-robot-pókdaru
Choose big aluminium windows and doors!
The use of aluminium doors and windows in family homes allows increasingly large glass surfaces to appear in residential buildings. Because we spend a large part of our time indoors, high-transparency aluminium windows and sliding doors help to create an almost direct connection with the environment. We discussed with Károly Lovász, the managing director of KAV Hungária, why it is worth choosing large doors and windows.
Show more
2022 / 05 / 05
optivision-KAV-uvegoptikas-saroksorolt-aluminium-nyilaszaro-telikert
Development by KAV of aluminium doors and windows with an all-glass look
Optivison© is unique in Hungary. (KAV is the only player in the small and medium-sized business sector to have developed aluminium doors and windows with an all-glass look for family homes.) Apart from KAV, no one among small and medium-sized enterprises has developed all-glass look aluminium fenestration for family houses. The system was designed to respond to the needs of our customers: we made the frame flush with the glass by rethinking the structure of tilt and turn windows and balcony doors. Our solution creates a ‘glass wing’ effect, making Optivison© systems the trend-setting doors and windows for modern family homes.
Show more
2017 / 10 / 26
KAV received an ALUTA Award of Excellence again
KAV received an ALUTA Award of Excellence again
In the “Small project” (i.e. residential building) category KAV received the 2017 ALUTA Award of Excellence for the special facade of its Zugliget family home reference, for its engineering work and implementation.
Show more
2020 / 03 / 30
we-will-come-out-of-this-situation-even-stronger
We will come out of this situation even stronger
Measures to curb the coronavirus epidemic have created unexpected situations in almost every area of our lives and economies. In this situation, how can we put in place competitive, proactive, and workable, yet effective procedures to serve customer needs? Károly Lovász, Managing Director of the company, reports on the changes at KAV.
Show more
2019 / 10 / 24
kav-production-unit-in-kisber
KAV production unit in Kisbér
Our company has started an investment in Kisbér in Komárom-Esztergom County. In addition to the production tasks, we will also carry out a number of preparatory and design work tasks at the factory's 3-acre site and their offices near the city. Károly Lovász, Managing Director of KAV, gives an insight into the possibilities and future plans of the new special windows and doors factory.
Show more
2018 / 03 / 12
Every property is sold once
Every property is sold once
By now, a personal needs assessment by an engineer has become the trademark of our company. We facilitate this process, in that our customers who request a quote may decide on the question of closing systems on the basis of an objective and clear set of requirements.
Show more
2023 / 03 / 21
Schüco-aluminium-3-KAV-PD77-FW50+-exclusive-window-sliding-door-glass-roof-exterior
Special KAV doors and windows in Költő Kert
MTVA's innovation magazine program, Novum, made a report on the special glass elements and door and window solutions of the 5,000 square meter Költő Kert villa park, a building complex that is also considered special in Europe. Environmental awareness, innovation, organic architectural elements with transparent huge glass surfaces, and a way of thinking in which visual culture also plays a prominent role. One of the biggest challenges in the Költő Kert villa park was the special solutions that the KAV staff had to create at the junction of the raw concrete surface and the glass membrane. Károly Lovász highlighted in the report that KAV's engineers and employees had to solve many challenges during the planning and execution, whether it was thermal technology, sun protection, mechanical engineering, glass railing connections or waterproofing. The result is a simultaneously organic and high-tech building, which is considered exceptional in Hungary not only in its appearance, but also in its innovations.
Show more
2023 / 03 / 30
Reynaers-hifinity-minimal-interior-kitchen-glass-frame-sliding-door-luxury
Do we need large glass surfaces everywhere?
Our colleagues are increasingly encountering residential building plans in which large glass surfaces dominate. These concepts are understandable not only from a design perspective but also because of transparency, connection with the environment, and the continuous influx of light. However, in many cases, they cannot be realized, or they require significantly higher investments and more complex alterations to the plans. In our new series, we explore the topic of the dimensions of glass surfaces with Mr. Károly Lovász, the CEO of KAV, and Mr. Csaba Mravik, the Chief Development Engineer.
Show more
2023 / 03 / 06
Reynaers-alumínium-emelő-toló-ajtó-üvegfal-beépítés-munkaközi-állapot-KAV-kivitelezés
Scandinavian-inspired house in the Balaton Uplands
A house in Révfülöp, for which KAV supplied the windows. Additionally, the construction progress of Zsuzsi's house can be followed by a closed Facebook group. We spoke with the homeowner about the construction process, her choice of professionals, and also touched upon how the construction industry receives a woman taking charge of a construction project, even though one wouldn't think it necessary to dwell on this topic in the 21st century.
Show more
2019 / 01 / 09
Schüco-alumínium-keret-nélküli-tolóajtó-PD77-slide-door-frameless-üvegfal-üveg-üveg-sorolás-nappali-beltér-interior-night
Reflecting the environment with closing systems
The KAV approach helped a lot in its implementation. They talk to the customer and they don't want to sell a product, they want to answer questions and look for a solution. I did not have to choose from a catalogue, so I was not forced to choose from a set of solutions, but was offered individual solutions to a given problem. Of the companies I worked with, KAV gave me the most technical support.
Show more
2022 / 01 / 10
Aluminium windows and services at KAV Home
Aluminium windows and services at KAV Home
KAV started off selling aluminium doors and windows for family houses professionally in Hungary. Thanks to this, and our unique working method and approach, we have been market leaders in our field for many years. Thanks to KAV Home, aluminium doors and windows are now available to a wider range of customers in the field of family house projects. We spoke to Erzsébet Kardos-Tamási, head of sales, and Károly Lovász, Executive Manager of KAV, about the services we offer in this product range.
Show more
2016 / 01 / 01
A Business Ethics Prize is granted to KAV Hungária
A Business Ethics Prize is granted to KAV Hungária
Responsible thinking became a winner
Show more
2019 / 05 / 16
Reynaers-aluminium-emelo-tolo-ajto-ablak-uveg-homlokzat-burkolat-Schlotterer-92Z-Raffstore-zsaluzia-minimal-house-terasz-lepcso-gyep-kert-kulter-exterior
The evolution of blinds
Climate change and increasingly sophisticated customer demands have accelerated the evolution of shading systems, not just of windows and doors. While in the past the goal was complete darkening, nowadays light control and maximum transparency are the main considerations. Thanks to this, most client choose lamellar and textile shadings.
Show more
2021 / 08 / 18
Lovász-Károly-KAV-Hungária
Impact of construction industry changes on the market for aluminium doors and windows
In the recent period, price increases and a shortage of raw materials have brought along significant changes in the construction industry. We discussed with Károly Lovász, Managing Director of KAV Hungária, how this affects the market for aluminium and custom doors and windows, and what KAV's customers should be prepared for.
Show more